Welcome, skip to the content.
Drakenstein Municipality, a large local government organisation in South Africa, engaged Aurecon to assist with their asset management programme. More information >
Markets: Water, Government, Transport, Energy Expertise: Asset management, Water resources management, Roads, Power generation, Land infrastructure
The Roads and Traffic Authority of NSW (RTA) initiated the development of a new flood evacuation route for the town of Windsor in Sydney’s north-west. More information >
Markets: Transport, Water, Construction Expertise: Environmental and community planning, Roads, Ground engineering, Programme and project delivery, Bulk water and dams, Land infrastructure
Being developed by Abu Dhabi’s Tourism Development & Investment Company (TDIC), who are in the process of transforming the island into a signature tourist, leisure, residential and cultural destination, the St. Regis Saadiyat Island resort and precinct forms part of a masterplan which will eventually see the island become home to the famed Guggenheim and Louvre museums. More information >
Markets: Construction, Property, Sports and leisure Expertise: Building structures, Ground engineering, Roads, Water resources management
Aurecon was appointed by the City of Cape Town for the design and construction supervision of the Granger Bay Boulevard and Green Point Traffic Circle which now provide effective access for vehicles and pedestrians to the Green Point Stadium and the Victoria and Alfred Waterfront. More information >
Markets: Transport, Urban transport Expertise: Roads, Transport systems and logistics
The SH20 Waterview Connection in Auckland forms part of the Western Ring Route (WRR), New Zealand’s largest transport project and a ‘road of national significance’. More information >
Markets: Transport, Urban transport Expertise: Roads, Ground engineering
Peninsula Link, a new four-lane 27km freeway, will provide a link between EastLink at Carrum Downs and the Mornington Peninsula Freeway at Mount Martha, south of Melbourne. More information >
Markets: Transport, Urban transport Expertise: Roads, Environmental and community planning
Aurecon was appointed in February 2009 to provide design, tender assistance and construction supervision for the reseal and rehabilitation of 66 km of existing surfaced road between Kawempe and Luwero. More information >
Markets: Transport, Rural transport Expertise: Roads
Aurecon was the lead consultant for the detailed design, environmental impact assessment (EIA), social impact assessment (SIA) and preparation of tender documents for the upgrading of 230 km of this road. More information >
Markets: Transport, Rural transport, Government Expertise: Roads, Environmental and community planning
In addition to the rehabilitation of the road, Aurecon was also responsible for the design upgrade of nine of the road-over-river bridges. More information >
Markets: Transport, Rural transport, Construction, Government Expertise: Roads, Business and infrastructure advisory, Programme and project delivery
Aurecon undertook the preliminary study related to the future widening of the Outer Bypass Road between Al Ain Road and Al Qudra Road in Dubai. Following this study, the Dubai Roads and Transport Authority appointed Aurecon to undertake a similar study for the widening of Al Qudra Road from Emirates Road to Jebel-Hibab Road. More information >
Markets: Transport, Urban transport, Government Expertise: Roads